HANGZHOU IKOM CONSTRUCTION MACHINERY CO.LTD.
Q
Methods of Payment:
A

1.1 T/T (Telegraphic Transfer) or WesternUnion or L/C at sight

1.2 Normally, we require 30% down payment at the time of order and 70% before shipment.

  

Next:Manufacture time for an order